In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Partington 3900 time(s). Sewage has been discharged for a total of 27342.4 hour(s). In total: 3.12 year(s)* of elapsed time.
89 The stations, on average, have been monitoring for 89% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Bent Lane Brook Carrs Ditch (Culvert) Carrs Ditech (Culvert) Culverted Tributary Of Bent Lane Brook Glaze Brook Manchester Ship Canal Manchester Ship Canal Via Surface Water Sewer Manchester Ship Canal Via Sws Red Brook River Bollin River Glaze River Glaze (Also Called Glaze Brook) River Glaze (Glaze Brook) River Glaze Via Surface Water Sewer River Glaze Via Sws River Mersey River Mersey Via A Surface Water Sewer River Mersey Via Surface Water Sewer River Mersey Via Sw Sewer Sinderland Brook Tributary Of Manchester Ship Canal
View Summaries Nearby
Partington - Yearly Summary
Summary for Year 2023
1308 Spills | 8650.4 hours
In 2023, sewage was discharged in, or near (~3mi.), Partington 1308 time(s). Sewage was discharged for a total of 8650.4 hour(s). In total: 0.98 year(s)* of elapsed time.
90.2 The stations, on average, have been monitoring for 90.2% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
1244 Spills | 7430.1 hours
In 2022, sewage was discharged in, or near (~3mi.), Partington 1244 time(s). Sewage was discharged for a total of 7430.1 hour(s). In total: 0.84 year(s)* of elapsed time.
90.1 The stations, on average, have been monitoring for 90.1% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
1348 Spills | 11261.9 hours
In 2021, sewage was discharged in, or near (~3mi.), Partington 1348 time(s). Sewage was discharged for a total of 11261.9 hour(s). In total: 1.28 year(s)* of elapsed time.
86.8 The stations, on average, have been monitoring for 86.8% of the total time in 2021. Stations with missing data have been excluded from this calculation.