In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Irlam 2844 time(s). Sewage has been discharged for a total of 21324.2 hour(s). In total: 2.43 year(s)* of elapsed time.
84 The stations, on average, have been monitoring for 84% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Carrs Ditch (Culvert) Carrs Ditech (Culvert) Glaze Brook Longford Brk Bent Lanes Brk Longford Brook/Bent Lanes Brook A Tributary Of The Manchester Ship Canal Manchester Ship Canal Manchester Ship Canal Via Surface Water Sewer Manchester Ship Canal Via Sws River Glaze River Glaze (Also Called Glaze Brook) River Glaze (Glaze Brook) River Mersey River Mersey Via A Surface Water Sewer River Mersey Via Surface Water Sewer River Mersey Via Sw Sewer Salteye Brook Salteye Brook (Trib. Of Manchester Ship Canal) Salteye Brook Via Surface Water Sewer Salteye Brook Via Sws Salteye Brook, A Trib Of The Manchester Ship Canal Stromford Brook Stromford Brook Via A Surface Water Sewer The Manchester Ship Canal
View Summaries Nearby
Irlam - Yearly Summary
Summary for Year 2023
1030 Spills | 7154.9 hours
In 2023, sewage was discharged in, or near (~3mi.), Irlam 1030 time(s). Sewage was discharged for a total of 7154.9 hour(s). In total: 0.81 year(s)* of elapsed time.
89.6 The stations, on average, have been monitoring for 89.6% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
779 Spills | 5411.2 hours
In 2022, sewage was discharged in, or near (~3mi.), Irlam 779 time(s). Sewage was discharged for a total of 5411.2 hour(s). In total: 0.61 year(s)* of elapsed time.
79.1 The stations, on average, have been monitoring for 79.1% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
1035 Spills | 8758 hours
In 2021, sewage was discharged in, or near (~3mi.), Irlam 1035 time(s). Sewage was discharged for a total of 8758 hour(s). In total: 0.99 year(s)* of elapsed time.
83.3 The stations, on average, have been monitoring for 83.3% of the total time in 2021. Stations with missing data have been excluded from this calculation.