River Lune Via A Surface at High Road Halton Combined Sewer Overflow (Lan0124) 259da
This is a sewage discharge monitoring station, which is usually a type of Event Duration Monitor (EDM). These stations themselves are designed to mitigate the impact of heavy rainfall by discharging, under permitted conditions, any overflow into a water body. They are often actively discharging during flood events. This page presents the data acquired by the monitoring system for this discharge station.
Sewage Reports that include this Station
Operational Summary - 2023-2023
River Lune Via A Surface | 0 Spills | 0 hours | 0
The declared body of water receiving this discharge is the "River Lune Via A Surface" This station has discharged sewage 0 time(s). The station has discharged for a total of 0 hour(s). This is 0% of the time which we have data for. In total: 0 day(s)* of elapsed time.
82 | 1576.8 hours This monitor has been operational for 82% of its total time we have data for. There are 1576.8 hours unaccounted for due to downtime of the monitor.
Uptimes below 90% (red line) should be accompanied by a reason
*This is total time in days, not individual days.
Yearly Summary
Most Recent Year - 2023
River Lune Via A Surface | 0 Spills | 0 hours | 0 The declared body of water receiving this discharge is the "River Lune Via A Surface" This station discharged sewage 0 time(s) during 2023. The station discharged for a total of 0 hour(s). This is around 0 day(s)* or 0% of the year.
82.5 | 1530.3 hours This monitor was operational for 82.5% of the year. Leaving 1530.3 hours unaccounted for in the data. This falls below the 90% threshold where a reason should be given
The following reasons have been given for the downtime in 2023: Installation Set-Up/Design Issue
The following description has been given for downtime related actions intended, or taken, by the operator in 2023: N/A - Ongoing Investigation
*This is total time in days, not individual days of the year.
Permit & Governance
Attribute
Value
Governing Body
The Environment Agency
Operator
United Utilities
Primary Permit #
EPR/JB3597EQ
Secondary Permit #
LAN0124
FloodMapper is not affiliated with this monitoring stations operator(s) or any other entities that may be mentioned on this page. All trademarks and registered trademarks are the property of their respective owners. Operator comments are presented, unedited, as they were received by us and do not reflect our views or position
Local Information
Nearby Flood Warnings
None
Nearby Alert Areas
River Lune at Skerton Pool, areas around Riverside Industrial Estate and Halton Training Camp
River Lune at Caton, Aughton Barns to Brow Cottage
Lower River Lune and Conder
River Lune at Caton, Claughton Terrace to Low Mill
River Lune at Halton, adjacent to river from Forgebank Walk to M6 bridge
River Lune at Halton, bordering M6, Church Brow, Mill Lane and Denny Beck Lane
Station overseen (meaning either provided, or regulated) by: The Environment Agency The information displayed here is used under license. We are not affiliated with any governing, or other, bodies. Nor do they necessarily endorse us, or us them. Please note that FloodMapper does not verify or check the accuracy of the data provided by third parties. The data is used as received from the source. Any underlying errors, inconsistencies, or inaccuracies in the original data will be reflected in the information presented on our platform. Users are advised to exercise their own judgment and caution when using the data for decision-making purposes. Information about our data sources and licenses can be found
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).