In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Ashton-under-Lyne 4467 time(s). Sewage has been discharged for a total of 22663.6 hour(s). In total: 2.58 year(s)* of elapsed time.
71.9 The stations, on average, have been monitoring for 71.9% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Carr Brook Via Sws Cock Brook County Brook Culvert To River Tame Culvert To The River Tame Culverted Section Of Gore Brook Culverted Section Of Lords Brook. Culverted Tributary Of The River Tame Culverted Tributary Of Wilson Brook Downshaw Brook Johnson Brook Lords Brook Lumb Brook Lumb Brook From A Surface Water Sewer Lumb Brook Via Surface Wtr Sew Moston Brook Via Surface Water Sewer Moston Brook Via Sws River Medlock River Tame River Tame Via A Culvert River Tame Via A Surface Water Sewer River Tame Via Surface Water Sewer River Tame Via Sws Smallshaw Brook Smallshaw Brook (Via A Surface Water Sewer) Smallshaw Brook Via Sws Stocks Brook Taunton (Smallshaw Beck) Taunton (Smallshaw) Brook Taunton Brook, Trib Of Medlock The River Tame Trib Of Acres Brook Via Sws Trib Of River Tame Via Sws Tributary Of Acres Brook Via A Surface Water Sewer Tributary Of Wilson Brook
View Summaries Nearby
Ashton-under-Lyne - Yearly Summary
Summary for Year 2023
2230 Spills | 15430.4 hours
In 2023, sewage was discharged in, or near (~3mi.), Ashton-under-Lyne 2230 time(s). Sewage was discharged for a total of 15430.4 hour(s). In total: 1.76 year(s)* of elapsed time.
89.8 The stations, on average, have been monitoring for 89.8% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
1144 Spills | 3745.3 hours
In 2022, sewage was discharged in, or near (~3mi.), Ashton-under-Lyne 1144 time(s). Sewage was discharged for a total of 3745.3 hour(s). In total: 0.42 year(s)* of elapsed time.
61.2 The stations, on average, have been monitoring for 61.2% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
1093 Spills | 3487.8 hours
In 2021, sewage was discharged in, or near (~3mi.), Ashton-under-Lyne 1093 time(s). Sewage was discharged for a total of 3487.8 hour(s). In total: 0.39 year(s)* of elapsed time.
64.7 The stations, on average, have been monitoring for 64.7% of the total time in 2021. Stations with missing data have been excluded from this calculation.