Davenham - Sewage Summary

 
Loading animation
Summary for Davenham 2021-2023
2606 Spills | 10092.9 hours

In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Davenham 2606 time(s).
Sewage has been discharged for a total of 10092.9 hour(s).
In total: 1.15 year(s)* of elapsed time.

79.1
The stations, on average, have been monitoring for 79.1% of the total time we have data for.



Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Culverted Tributary Of Wade Brook Eldersbriar Brook Peckmill Bk (Trib Of R.Dane) Peckmill Brook Via A Surface Water Sewer Pettypool Brook Pettypool Brook Tributary Of River Weaver River Dane River Dane Via A Surface Water Sewer River Dane Via Surface Water Sewer River Dane Via Sws River Weaver River Weaver (Via A Surface Water Sewer) The River Weaver The River Weaver Navigation Trib Of Peckmill Brook Trib Of Wade Brook Trib Peckmill Brook Via Sws Tributary Of Peckmill Brook Tributary Of Peckmill Brook Via A Surface Water Sewer Tributary Of The River Weaver Wade Brook Wade Brook Via Culverted Watercourse Wade Brook Via Surface Water Sewer Wade Brook Via Sws Weaver Navigation Weaver Navigation Via Surface Water Sewer Weaver Navigation Via Sws
View Summaries Nearby
Davenham - Yearly Summary
Summary for Year 2023
1058 Spills | 4984.4 hours

In 2023, sewage was discharged in, or near (~3mi.), Davenham 1058 time(s).
Sewage was discharged for a total of 4984.4 hour(s).
In total: 0.56 year(s)* of elapsed time.

87.6
The stations, on average, have been monitoring for 87.6% of the total time in 2023.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2023
Summary for Year 2022
633 Spills | 1426.2 hours

In 2022, sewage was discharged in, or near (~3mi.), Davenham 633 time(s).
Sewage was discharged for a total of 1426.2 hour(s).
In total: 0.16 year(s)* of elapsed time.

78.2
The stations, on average, have been monitoring for 78.2% of the total time in 2022.
Stations with missing data have been excluded from this calculation.


Summary for Year 2021
915 Spills | 3682.3 hours

In 2021, sewage was discharged in, or near (~3mi.), Davenham 915 time(s).
Sewage was discharged for a total of 3682.3 hour(s).
In total: 0.42 year(s)* of elapsed time.

71.6
The stations, on average, have been monitoring for 71.6% of the total time in 2021.
Stations with missing data have been excluded from this calculation.


* - Elapsed time, in years or days, is the sum of time across the station(s) for which discharge event(s) have occured.
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved