In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Combeinteignhead 2084 time(s). Sewage has been discharged for a total of 13530.2 hour(s). In total: 1.54 year(s)* of elapsed time.
91.8 The stations, on average, have been monitoring for 91.8% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Aller Brook (S) Aller Brook(S) Bitten Brook (S) Bitton Brook (S) Bitton Brook Via Sws Combe Stream Netherton Brook Ringmore Stream (S) River Lemon Via Sws River Teign Via S/W Sewer(S) River Teign Via Sws Estuarine S/W Sewer To Aller Brook(S) Sewer To Aller Brook (S) Surface Water Sewer (S) Surface Water Sewer(S) Sws To The Aller Brook (S) Teign Estuary Teign Estuary (E) Teign Estuary(E) The Aller Brook (S) The Arch Brook (S) Trib O Riv.Teign Via Sw Sewer Trib Of R.Teign(S) Trib Of River Teign(S) Tributary O Teign Estuary(S) Tributary Of River Teign
View Summaries Nearby
Combeinteignhead - Yearly Summary
Summary for Year 2023
983 Spills | 7066.1 hours
In 2023, sewage was discharged in, or near (~3mi.), Combeinteignhead 983 time(s). Sewage was discharged for a total of 7066.1 hour(s). In total: 0.8 year(s)* of elapsed time.
90.5 The stations, on average, have been monitoring for 90.5% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
548 Spills | 3513.4 hours
In 2022, sewage was discharged in, or near (~3mi.), Combeinteignhead 548 time(s). Sewage was discharged for a total of 3513.4 hour(s). In total: 0.4 year(s)* of elapsed time.
90.6 The stations, on average, have been monitoring for 90.6% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
553 Spills | 2950.5 hours
In 2021, sewage was discharged in, or near (~3mi.), Combeinteignhead 553 time(s). Sewage was discharged for a total of 2950.5 hour(s). In total: 0.33 year(s)* of elapsed time.
94.2 The stations, on average, have been monitoring for 94.2% of the total time in 2021. Stations with missing data have been excluded from this calculation.