In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Pickup Bank 1542 time(s). Sewage has been discharged for a total of 1589.9 hour(s). In total: 0.18 year(s)* of elapsed time.
94.1 The stations, on average, have been monitoring for 94.1% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
A Culverted Section Of River Darwen A Culverted Section Of The River Darwen Via A Surface Water Sewer Clvrtd Section Of River Darwen Culverted Section Of River Darwen Culverted Section River Darwen Culverted Tributary Of River Darwen Culverted Tributary Of River Darwen (Union Street) Culverted Tributary Of River Darwen Via Surface Water Sewer Culverted Tributary Of The River Darwen Culverted Tributary Of The River Darwen Via A Surface Water Sewer Kebbs Brook Via A Culvert, A Tributary Of The River Darwen Kebbs Brook,Trib Of Riv Darwen River Darwen River Darwen (Sewer) River Darwen Via Sws River Goyt River Medlock (Via Surface Water Sewer) River Medlock Via Sws Trib River Darwen Tributary Of River Darwen Unnamed Trib Of River Darwen Unnamed Tributary Of The River Darwen Waterside Brook
View Summaries Nearby
Pickup Bank - Yearly Summary
Summary for Year 2023
545 Spills | 579.2 hours
In 2023, sewage was discharged in, or near (~3mi.), Pickup Bank 545 time(s). Sewage was discharged for a total of 579.2 hour(s). In total: 0.06 year(s)* of elapsed time.
99.6 The stations, on average, have been monitoring for 99.6% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
483 Spills | 391.9 hours
In 2022, sewage was discharged in, or near (~3mi.), Pickup Bank 483 time(s). Sewage was discharged for a total of 391.9 hour(s). In total: 0.04 year(s)* of elapsed time.
88.9 The stations, on average, have been monitoring for 88.9% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
514 Spills | 618.7 hours
In 2021, sewage was discharged in, or near (~3mi.), Pickup Bank 514 time(s). Sewage was discharged for a total of 618.7 hour(s). In total: 0.07 year(s)* of elapsed time.
93.7 The stations, on average, have been monitoring for 93.7% of the total time in 2021. Stations with missing data have been excluded from this calculation.