Farington Moss - Sewage Summary

 
Loading animation
Summary for Farington Moss 2021-2023
2791 Spills | 10811.9 hours

In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Farington Moss 2791 time(s).
Sewage has been discharged for a total of 10811.9 hour(s).
In total: 1.23 year(s)* of elapsed time.

97
The stations, on average, have been monitoring for 97% of the total time we have data for.



Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
A Culverted Section Bannister Brook, Tributary Of The River Lostock Bannister Brook Boundary Brook Boundary Brook (Tributary Of The River Ribble) Boundary Brook A Trib Of The River Ribble Boundary Brook Trib Riv Ribble Bow Brook Cockshott Bk Trb R Darwen Cockshott Brook A Tributary Of The River Darwen Culverted Section Of Bannister Brook Hennel Brook Hennel Brook, A Tributary Of The River Darwin Mill Brook River Darwen River Darwin River Lostock River Lostock Via A Surface Water Sewer River Lostock Via Surface Water Sewer River Ribble River Ribble (Tidal) River Ribble Estuarine Waters River Ribble Estuary Tidal Ribble River Tribof River Ribble Tributary Of The River Ribble, Via A Surface Water Sewer
View Summaries Nearby
Farington Moss - Yearly Summary
Summary for Year 2023
1008 Spills | 3986.4 hours

In 2023, sewage was discharged in, or near (~3mi.), Farington Moss 1008 time(s).
Sewage was discharged for a total of 3986.4 hour(s).
In total: 0.45 year(s)* of elapsed time.

99.4
The stations, on average, have been monitoring for 99.4% of the total time in 2023.
Stations with missing data have been excluded from this calculation.


Summary for Year 2022
842 Spills | 2352.5 hours

In 2022, sewage was discharged in, or near (~3mi.), Farington Moss 842 time(s).
Sewage was discharged for a total of 2352.5 hour(s).
In total: 0.26 year(s)* of elapsed time.

95.6
The stations, on average, have been monitoring for 95.6% of the total time in 2022.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2022
Summary for Year 2021
941 Spills | 4472.9 hours

In 2021, sewage was discharged in, or near (~3mi.), Farington Moss 941 time(s).
Sewage was discharged for a total of 4472.9 hour(s).
In total: 0.51 year(s)* of elapsed time.

96
The stations, on average, have been monitoring for 96% of the total time in 2021.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2021
* - Elapsed time, in years or days, is the sum of time across the station(s) for which discharge event(s) have occured.
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved