In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Pilling Lane 351 time(s). Sewage has been discharged for a total of 2798.2 hour(s). In total: 0.31 year(s)* of elapsed time.
87.9 The stations, on average, have been monitoring for 87.9% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Copse Brook Culvert Grange Pool River Wyre Estuary Trib Of Cockers Dyke Tributary Of Cockers Dyke Unknown Wyre Estuary
View Summaries Nearby
Pilling Lane - Yearly Summary
Summary for Year 2023
173 Spills | 1357.8 hours
In 2023, sewage was discharged in, or near (~3mi.), Pilling Lane 173 time(s). Sewage was discharged for a total of 1357.8 hour(s). In total: 0.15 year(s)* of elapsed time.
97.2 The stations, on average, have been monitoring for 97.2% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
60 Spills | 399.2 hours
In 2022, sewage was discharged in, or near (~3mi.), Pilling Lane 60 time(s). Sewage was discharged for a total of 399.2 hour(s). In total: 0.04 year(s)* of elapsed time.
85.7 The stations, on average, have been monitoring for 85.7% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
118 Spills | 1041.1 hours
In 2021, sewage was discharged in, or near (~3mi.), Pilling Lane 118 time(s). Sewage was discharged for a total of 1041.1 hour(s). In total: 0.11 year(s)* of elapsed time.
81 The stations, on average, have been monitoring for 81% of the total time in 2021. Stations with missing data have been excluded from this calculation.